Custom control panels · Midwest

Is your panel project
ready for a quote?

A clearer path from your first drawing to a panel built for your machine.

Answer 5 quick questions to find out what’s ready, what’s missing, and what to prepare for your quote.

Free check • About 1–2 minutes • Instant results

SPINULA ENGINEERING

Free check · 5 questions · About 1–2 minutes

Is your panel project ready for a quote?

Find out what is ready and what to gather next. Enter your details to begin.

Your details are saved when you continue. Privacy notice

Start with your name, email, and phone.

Already have your documents? Request a quote

Prefer to talk? +1 (517) 262-2149

Open control panel showing the PLC, circuit breakers, relays, and labeled terminal wiring
01 / INSIDE THE BUILDEngineering you can see.PLC, protection, and field connections.

Built in MichiganLocal production and testing

One panel or a batchA practical place to start

Build-to-print + designSupport where your project needs it

For machine builders, OEMs & integrators

Keep your machine project moving.

A focused panel-building service, with one project contact from the first drawing to delivery.

01

Extend your panel-building capacity.

Bring a defined panel build to Spinula while your team stays focused on the machine and its integration.

02

Keep your specifications at the center.

Build from your drawings and bill of materials, with electrical design support available when the package needs development.

03

Prepare for installation and service.

Receive a pre-wired, labeled panel with the testing and documentation agreed for your project.

Start with one panel.

Evaluate the working relationship on a defined project, then discuss the next build when you are ready.

Inside of the control panel door with HMI connections, identified wires, and operator-device wiring
02 / DOOR ASSEMBLYConnected. Identified. Organized.
Terminal blocks, labeled conductors, grounding connections, and wire duct inside a control enclosure
03 / FIELD CONNECTIONSDetails that support service.

A closer look at our panels

Know what is built.
Know what is checked.

Clear documentation connects your specification to the finished panel.

01

Your build package

Drawings, bill of materials, and revision status establish a common reference for the work.

02

Checks before shipment

Wiring, labeling, inspection, and testing follow the requirements agreed for your panel.

03

Records for your team

The agreed diagrams and release records support installation, troubleshooting, and service.

Need UL 508A labeling? Include it in your inquiry so the applicable build and labeling requirements are part of the proposal.

From inquiry to delivery

Three steps. One project contact.

  1. 01

    Tell us what you need

    Share the application, quantity, target date, and any drawings you already have. An incomplete package is a starting point, too.

  2. 02

    Align the proposal

    We review the technical requirements and define the build, price, schedule, testing, and documentation with you.

  3. 03

    Build, test, and deliver

    Spinula manages production in Michigan and coordinates inspection, project records, release, and delivery.

Request a Panel Quote

Still preparing your project?

Find out what to gather for a quote.

Five questions. About 1–2 minutes. Get a personalized checklist of what to prepare for your panel quote.

Before you get started

Your panel project, answered.

Speak with us at +1 (517) 262-2149.

Can I request a quote without finished drawings?

Yes. Describe the application and what documentation you have. We can identify the missing inputs and define electrical design work separately if needed.

Can you build one panel or support repeat orders?

You can begin with one panel or a small batch. Tell us about any repeat-build requirements so we can review quantities, revisions, and scheduling. Future orders can be agreed separately.

Where are the panels built?

Panels are built and tested in Michigan. Spinula is your commercial and project contact, from the initial review through delivery.

Can you supply UL 508A-labeled panels?

UL 508A-labeled panels are available when required. Specify that requirement during project review; when included in the accepted scope, the panel is built and labeled under the applicable UL 508A program.

What testing and documentation will I receive?

The proposal identifies the inspections, electrical tests, labeling, drawings, release records, and any factory acceptance test required for your project. The agreed scope determines the final package.

How soon can you review my project?

Initial scope review is normally within 24–48 hours after sufficient information is received. This is an initial review, not a guaranteed completed quote or a fabrication or delivery lead time. Your project schedule is agreed in the proposal.

Are my drawings publicly accessible?

No. Uploaded files are held in restricted storage and accessed through a private, request-specific review workflow. You can send your initial inquiry without attaching files.

Let’s review your project

Request a panel quote.

Tell us what you need built. Share drawings if you have them; you can start the conversation without a complete package.

What happens next

We review the available information, clarify technical questions, and agree on the next step toward your proposal.

Prefer a call? +1 (517) 262-2149

Add project details optional

Your files are private and are not publicly accessible.

You can start with a description. Drawings can follow later.